915 9th Street Minor Adjustment

Share 915 9th Street Minor Adjustment on Facebook Share 915 9th Street Minor Adjustment on Twitter Share 915 9th Street Minor Adjustment on Linkedin Email 915 9th Street Minor Adjustment link
Icon of building plans with an aerial view of a residential cul-de-sac with homes

Application Type(s): Minor Adjustment


Project Overview

The new house at 915 9th Street has a 5 foot closed-side setback on the west property line. The final setback verification indicates the building foundation is 4.86 feet from the property line. The encroachment was approved in error by staff when the structural foundation plans were approved with the building permit but was not identified until the house was constructed. The Director approves a minor setback adjustment finding the setback is not reduced more than 20% and the practical difficulty was the reasonable reliance on the approved construction documents.

  • Application Type(s): Minor Adjustment for previously approved FZSP
  • Case Number(s): PC26-21 (minor adjustment), PC23-16 (FZsP)
  • Applicant: Joe Ogg, Ogg Construction/ Jeff Martin, property owner
  • Approval Status(s): Approved
  • Next Steps: Final inspections

Project Documents

  • Case Packet:
    • Staff Report
    • Supporting documents



Applicable Standards & Codes


Contact Information

For questions or concerns, contact:

  • Planning Department: (303) 384-8097
  • Email: Planning@cityofgolden.net

Application Type(s): Minor Adjustment


Project Overview

The new house at 915 9th Street has a 5 foot closed-side setback on the west property line. The final setback verification indicates the building foundation is 4.86 feet from the property line. The encroachment was approved in error by staff when the structural foundation plans were approved with the building permit but was not identified until the house was constructed. The Director approves a minor setback adjustment finding the setback is not reduced more than 20% and the practical difficulty was the reasonable reliance on the approved construction documents.

  • Application Type(s): Minor Adjustment for previously approved FZSP
  • Case Number(s): PC26-21 (minor adjustment), PC23-16 (FZsP)
  • Applicant: Joe Ogg, Ogg Construction/ Jeff Martin, property owner
  • Approval Status(s): Approved
  • Next Steps: Final inspections

Project Documents

  • Case Packet:
    • Staff Report
    • Supporting documents



Applicable Standards & Codes