Search results
Results with street closures
Page 14 of 17. Found 164.
Summary of Feedback
expanding the library and improving facilities, such as bathrooms in Vanover Park.FinanceConcerns over the cost of new developments, with a desire for more transparency regarding costs and debt.Safety and Cleanliness Calls to improve traffic safety on Ford Street
CONCLUDED - PC25-15 - FZSP - 816 Partridge Cir.
One minor adjustment related to the sidewalk width was approved simultaneously with this request because the sidewalk is on a Local Street, pedestrian volume is not anticipated to increase, and the decrease better connects to the existing sidewalk network.If
Golden Building Blocks
Enter to win the Golden Building Blocks raffle* just by uploading at least one photo of a Golden building or street, with a brief description of why it exemplifies Golden’s “small town character.”
2019-2020 Biennial Budget Process
A good portion of the budget is always used to maintain our existing infrastructure, including water systems, street repair, snow plowing and parks.
Ore Cart Service & Transit Planning
RTD continues to operate the 17 (formerly the 16) bus route between the Oak Street W Line station and Downtown Golden via South Golden Road.
Phase 2 Commercial Zoning Code Comments
For example, the Main Street Form Types have their design guidelines and standards in 18.29.03.022, and this covers massing and articulation, porch and balcony characteristics, transparency and blank walls, facade configuration and exterior materials.
Discussion
A real, on street bike lane uphill on Ford between 10th and 5th and/or a nicer option on Washington are key missing links. , For Washington, a starting point might be sharrows (not my favorite, but better than nothing) on the more gentle part from 10th
Meeting 3 Information
In addition to the new building site, the City also owns approximately 3.7 acres of surface parking lots on the north side of 10th Street. Appraisals indicated a market value between $6.5 million and $7.5 million.
Ulysses Park Redevelopment Project
Community safety and delivering a top-tier facility and amenities are our highest priorities.Throughout the duration of the project, regular schedule and closure updates will be posted here on Guiding Golden.Closure DetailsFull closures: South parking
Lead Service Line Inventory Project
Star Energy Services will restore your property (including sod, landscaping, concrete, asphalt, etc.) upon completion of the potholing.Service Line Timeline in Golden1937: Ordinance 151 is adopted in City of Golden requiring that service lines from street