Search results
Results with street closures
Page 19 of 19. Found 185.
CONCLUDED - PC25-15 - FZSP - 816 Partridge Cir.
One minor adjustment related to the sidewalk width was approved simultaneously with this request because the sidewalk is on a Local Street, pedestrian volume is not anticipated to increase, and the decrease better connects to the existing sidewalk network.If
Golden Building Blocks
Enter to win the Golden Building Blocks raffle* just by uploading at least one photo of a Golden building or street, with a brief description of why it exemplifies Golden’s “small town character.”
CoorsTek Rezoning
Commercial), and M-2 (General Industrial) to Planned Unit Development (PUD) with an Official Development Plan (ODP) for a mixed-use redevelopment and an alley vacation for the CoorsTek site, located generally at 600 9th Street.
2019-2020 Biennial Budget Process
A good portion of the budget is always used to maintain our existing infrastructure, including water systems, street repair, snow plowing and parks.
Ulysses Park Redevelopment Project
Community safety and delivering a top-tier facility and amenities are our highest priorities.Throughout the duration of the project, regular schedule and closure updates will be posted here on Guiding Golden.Closure DetailsFull closures: South parking