Application Type(s): Lot Line Adjustment
Project Overview
The property at 601 and 603 Entrada are part of the Eagle Ridge PUD. The Eagle Ridge PUD was approved in 1986 and the properties are in the area originally designated commercial in Parcel A. That part of the PUD was amended in 1994 to allow residential lots in a new "Parcel B." Lots need a minimum lot size of 4,000 sq. ft. and minimum lot width of 40 feet. The PUD amendment also notes an average lot size of 4,700 sq. ft. Staff performed an analysis of the lots and the average lot size prior to the lot split was 5,672 sq. ft. and 5,635 sq. ft. after. A lot line adjustment was approved in 2024 to create one additional lot having met the PUD standards and demonstrating a buildable area with setbacks.
Final confirmation of building location, height, and other site standards like site-distance triangle compliance are confirmed with a building permit application. There was a pre-application meeting to discuss a proposed concept plan for the site. Staff notes that final details and conditions are reviewed with a building permit, including fencing which the concept does not appear to meet the site distance requirements as shown. While the building concept appears to be approvable, there is not a submitted or approved building permit on the lot.
The property at 601 and 603 Entrada are part of the Eagle Ridge PUD. The Eagle Ridge PUD was approved in 1986 and the properties are in the area originally designated commercial in Parcel A. That part of the PUD was amended in 1994 to allow residential lots in a new "Parcel B." Lots need a minimum lot size of 4,000 sq. ft. and minimum lot width of 40 feet. The PUD amendment also notes an average lot size of 4,700 sq. ft. Staff performed an analysis of the lots and the average lot size prior to the lot split was 5,672 sq. ft. and 5,635 sq. ft. after. A lot line adjustment was approved in 2024 to create one additional lot having met the PUD standards and demonstrating a buildable area with setbacks.
Final confirmation of building location, height, and other site standards like site-distance triangle compliance are confirmed with a building permit application. There was a pre-application meeting to discuss a proposed concept plan for the site. Staff notes that final details and conditions are reviewed with a building permit, including fencing which the concept does not appear to meet the site distance requirements as shown. While the building concept appears to be approvable, there is not a submitted or approved building permit on the lot.
601 Entrada and 603 Entrada Lot Split has finished this stage
This consultation is open for contributions.
Under Review
601 Entrada and 603 Entrada Lot Split has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
601 Entrada and 603 Entrada Lot Split has finished this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
Pending construction
601 Entrada and 603 Entrada Lot Split is currently at this stage