2208 Arapahoe - Village House Addition

Share 2208 Arapahoe - Village House Addition on Facebook Share 2208 Arapahoe - Village House Addition on X (formerly Twitter) Share 2208 Arapahoe - Village House Addition on Linkedin Email 2208 Arapahoe - Village House Addition link
Icon of building plans with an aerial view of a residential cul-de-sac with homes

Application Type(s): Form Zone Site Plan


Project Overview

The applicant proposes an addition to the existing home along with a new detached garage at the rear of the property. The new garage will take access from the alley, replacing the current front-loaded garage and bringing the property into closer conformance with the Village House form type. Exterior site improvements include a new porch and the partial removal of the driveway along Arapahoe Street. A portion of the existing concrete driveway will be retained as a patio area, while the section adjacent to the street will be removed and landscaped, eliminating vehicular access from the street.

  • Application Type(s): Form Zone Site Plan (FZSP)
  • Case Number(s): PC26-15
  • Applicant: Giovanna Antonelli, Giant Architecture
  • Approval Status(s): Administratively approved, currently in call-up period
  • Next Steps: Call-up period, building permit review and issuance, construction, final inspections

Project Documents


Notices & Call-Up Period

  • Director Approval: Approved
  • Call-Up Period: 9/1/2026 - 9/22/2026
  • Call-Up Procedure:
    • Two members of City Council may initiate a Call-Up by submitting a written request to the City Clerk within the specified period.
    • If called up, a Planning Commission hearing will be scheduled within 30 days of the request.

Applicable Standards & Codes


Contact Information

For questions or concerns, contact:

  • Planning Department: (303) 384-8097
  • Email: Planning@cityofgolden.gov

Application Type(s): Form Zone Site Plan


Project Overview

The applicant proposes an addition to the existing home along with a new detached garage at the rear of the property. The new garage will take access from the alley, replacing the current front-loaded garage and bringing the property into closer conformance with the Village House form type. Exterior site improvements include a new porch and the partial removal of the driveway along Arapahoe Street. A portion of the existing concrete driveway will be retained as a patio area, while the section adjacent to the street will be removed and landscaped, eliminating vehicular access from the street.

  • Application Type(s): Form Zone Site Plan (FZSP)
  • Case Number(s): PC26-15
  • Applicant: Giovanna Antonelli, Giant Architecture
  • Approval Status(s): Administratively approved, currently in call-up period
  • Next Steps: Call-up period, building permit review and issuance, construction, final inspections

Project Documents


Notices & Call-Up Period

  • Director Approval: Approved
  • Call-Up Period: 9/1/2026 - 9/22/2026
  • Call-Up Procedure:
    • Two members of City Council may initiate a Call-Up by submitting a written request to the City Clerk within the specified period.
    • If called up, a Planning Commission hearing will be scheduled within 30 days of the request.

Applicable Standards & Codes


Contact Information

For questions or concerns, contact:

  • Planning Department: (303) 384-8097
  • Email: Planning@cityofgolden.gov
Page published: 01 Sep 2026, 03:14 PM