Share 2200 Ford St. - New Office Building - PC25-28 on FacebookShare 2200 Ford St. - New Office Building - PC25-28 on TwitterShare 2200 Ford St. - New Office Building - PC25-28 on LinkedinEmail 2200 Ford St. - New Office Building - PC25-28 link
Project Overview
Application Type(s): Public Hearing Variance (approved), FZSP (approved), Lot Line Adjustment (under review)
Case Numbers: PC24-18, PC25-03, PC25-28
Applicant: Cindy Pedrioli
Approval Status: :Lot line adjustment under review
Next Steps: Pending construction
The project is for a 3 story office building at 2200 Ford St. built to the Shop with Apartment over Shop form type. The application has received approval by Planning Commission to reduce the loading area size and dimensions to match the urban infill context of the site. The development will remove and replace the existing muffler shop on the site and intends to incorporate the muffler man sign as art in the building.
Final approval of the lot line adjustment is pending and a building permit is expected in August 2025. Construction is anticipated to start in Fall 2025. Public improvements will be coordinated with other improvements planned for Ford St.
Contact Information
For questions or concerns, contact Karl Onsager.
Planning Department: 303.277.8772
Email: planning@cityofgolden.net
Project Overview
Application Type(s): Public Hearing Variance (approved), FZSP (approved), Lot Line Adjustment (under review)
Case Numbers: PC24-18, PC25-03, PC25-28
Applicant: Cindy Pedrioli
Approval Status: :Lot line adjustment under review
Next Steps: Pending construction
The project is for a 3 story office building at 2200 Ford St. built to the Shop with Apartment over Shop form type. The application has received approval by Planning Commission to reduce the loading area size and dimensions to match the urban infill context of the site. The development will remove and replace the existing muffler shop on the site and intends to incorporate the muffler man sign as art in the building.
Final approval of the lot line adjustment is pending and a building permit is expected in August 2025. Construction is anticipated to start in Fall 2025. Public improvements will be coordinated with other improvements planned for Ford St.
2200 Ford St. - New Office Building - PC25-28 has finished this stage
This consultation is open for contributions.
Under Review
2200 Ford St. - New Office Building - PC25-28 has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
2200 Ford St. - New Office Building - PC25-28 has finished this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
Construction pending
2200 Ford St. - New Office Building - PC25-28 is currently at this stage